Home
Choose Checklist
AMCO
710-409-00 Rev A, S48592-100R
710-806-00 Rev A, S48592-75R
Inspection Checklist (Default)
S44853 (Plexus ASM7010G-318 Rev. H1)
S45934 (Department of Defense)
S46681 (World Wide Technology)
S47264 (Department of Defense)
S47265 (Department of Defense)
S47266 (Department of Defense)
S47267 (Department of Defense)
S47477 (Cancom)
S47480 (Northrop Grumman)
S47519 (Department of Defense)
S47566 (Dedicated Computing)
S47567 (Argonne)
S47568 (Argonne)
S47584 (Dedicated Computing)
S48097 Rev. C (Northrop Grumman)
S48344 Rev. B (Northrop Grumman)
S48612 (Synopsys)
S48734 (Boyd)
Versum Welding & Grinding
Assembly
Atlas Ci4400 26004400 Assembly
Cubic 10057679 – Outdoor Cabinet Rev. D
S47517 (Rivian)
Electrol
Cobra
Eaton T350
Eaton T350 Gen 2
Eaton T875
Faith UNO2A
Grainger E-SOOW-L22-20C004-BK-L22-30P-SW10
LST Control Panel Inspection Sheet Ver.21.0
LST Control Panel Inspection Sheet Ver.21.2
LST Main Panel
Matrix Management VC5030
Matrix Management VC5050
Matrix Management VC5051A
Matrix Management VC5056
Matrix Management VC5057A
Matrix Management VC5058
Matrix Management VC5080
Matrix Management VC5081
Meta
Miller
MTS
SunWa Fan
IMS EP Forms
IMS EP Forklift
IMS EP Vehicle
Submission Received
Select Page
Return to the checklist selection list
SunWa Fan
Please enable JavaScript in your browser to complete this form.
Part
*
Job
*
Operator Clock
*
QC Inspector
*
Date
*
Check Paint Finishes, Fan and Housing should be free of any scratches or blemishes / Verifique los acabados de pintura, el ventilador y la carcasa deben estar libres de rayones o imperfecciones
*
Pass / Aprobado
Fail / Rechazado
Comments
Verify that the Pipe (Hole) plug is present and secured / Verifique que el tapón de la tubería (orificio) esté presente y asegurado
*
Pass / Aprobado
Fail / Rechazado
Comments
Verify that the wires are in the proper position of the connector and they are secure / Verifique que los cables estén en la posición correcta del conector y que estén seguros
*
Pass / Aprobado
Fail / Rechazado
Comments
Verify that the cord grip is on the cable / Verifique que el sujetador del cable esté en el cable
*
Pass / Aprobado
Fail / Rechazado
Comments
Check that the threads on the fittings are not damaged / Compruebe que las roscas de los accesorios no estén dañadas
*
Pass / Aprobado
Fail / Rechazado
Comments
Check alignment of double elbow fitting and for potential damage to radiator from over torquing / Verifique la alineación del accesorio de doble codo y busque posibles daños en el radiador causados por un apriete excesivo
*
Pass / Aprobado
Fail / Rechazado
Comments
Verify that all fittings are properly secured / Verifique que todos los accesorios estén correctamente asegurados
*
Pass / Aprobado
Fail / Rechazado
Comments
Check that the fan is properly secured / Compruebe que el ventilador esté correctamente fijado
*
Pass / Aprobado
Fail / Rechazado
Comments
Check that the radiator is properly secured / Compruebe que el radiador esté correctamente fijado
*
Pass / Aprobado
Fail / Rechazado
Comments
Check that all hardware is present and properly secured / Verifique que todo el hardware esté presente y correctamente asegurado
*
Pass / Aprobado
Fail / Rechazado
Comments
Signature
*
Clear Signature
Submit