Home
Choose Checklist
AMCO
710-409-00 Rev A, S48592-100R
710-806-00 Rev A, S48592-75R
Inspection Checklist (Default)
S44853 (Plexus ASM7010G-318 Rev. H1)
S45934 (Department of Defense)
S46681 (World Wide Technology)
S47264 (Department of Defense)
S47265 (Department of Defense)
S47266 (Department of Defense)
S47267 (Department of Defense)
S47477 (Cancom)
S47480 (Northrop Grumman)
S47519 (Department of Defense)
S47566 (Dedicated Computing)
S47567 (Argonne)
S47568 (Argonne)
S47584 (Dedicated Computing)
S48097 Rev. C (Northrop Grumman)
S48344 Rev. B (Northrop Grumman)
S48612 (Synopsys)
S48734 (Boyd)
Versum Welding & Grinding
Assembly
Atlas Ci4400 26004400 Assembly
Cubic 10057679 – Outdoor Cabinet Rev. D
S47517 (Rivian)
Electrol
Cobra
Eaton T350
Eaton T350 Gen 2
Eaton T875
Faith UNO2A
Grainger E-SOOW-L22-20C004-BK-L22-30P-SW10
LST Control Panel Inspection Sheet Ver.21.0
LST Control Panel Inspection Sheet Ver.21.2
LST Main Panel
Matrix Management VC5030
Matrix Management VC5050
Matrix Management VC5051A
Matrix Management VC5056
Matrix Management VC5057A
Matrix Management VC5058
Matrix Management VC5080
Matrix Management VC5081
Meta
Miller
MTS
SunWa Fan
IMS EP Forms
IMS EP Forklift
IMS EP Vehicle
Submission Received
Select Page
Return to the checklist selection list
Grainger E-SOOW-L22-20C004-BK-L22-30P-SW10
Please enable JavaScript in your browser to complete this form.
Part
*
Job
*
Enter Serial Number
*
Document any failures so the Team can be notified and used as a training tool.
Confirm Job Traveler and Revision Number with Drawing.
*
OK
Fail
Comments
Inspect assembly to the Drawing.
*
OK
Fail
Comments
Check for any cuts to wire when decasing.
*
OK
Fail
Check for any nicks to wires when removing fillers.
*
OK
Fail
Check for any nicks or cuts to wires strands.
*
OK
Fail
Confirm connector part numbers to drawing.
*
OK
Fail
Check that wires are seated properly in connector, no strands are sticking out.
*
OK
Fail
All screws are properly torqued.
*
OK
Fail
No cracks in strain relief.
*
OK
Fail
Heatshrink is properly applied.
*
OK
Fail
Assembly Passed test.
*
OK
Fail
Barcode Label properly applied.
*
OK
Fail
Comments
Auditor
*
Date
*
By performing and signing this checklist the operator acknowledges this unit is properly completed and inspected (sign name).
*
Clear Signature
Submit